Campaign 24 in normal ops will use the following standards. This plan is based on a campaign with a length of 10 days. target letter sp. F_12 (Jy) dec. eta1 Dor A A0 0.17 -66 ksi Dra B+ K2' 16.8 +56 HD 173511 C+ K4 1.19 +61 HR 6348 D+ K0 1.15 +61 HR 7341 E+ K3 1.43 +49 del Dra F+ G9 18.3 +67 For a campaign lasting 10 days (plus any fraction), sources should be observed in the following order: 15-day schedule............... day sequence day sequence 1 A B+ C+ 8 A B+ C+ 2 9 D+ 3 D+ 10 4 5 E+ 6 7 F+ Note 1: The targets with a "+" after their letters will require an offset sky observation to be conducted immediately before or after them. These sky AORs are included in the AOR file, and they have similar labels, with the name of the target replaced with "sky". For example, calsfx-24E-HR7341 and calsfx-24E-sky are a pair. Note 2: For the purposes of calibration, it is preferable that A, B, and C are observed as close in time as possible, ideally (but not necessarily) the same day. However, in order to preserve flexibility in the schedule, no AOR constraint has been introduced. Observational details DCEs for .................................... total AORNAME root SL2 SL1 LL2 LL1 SH LH PU DCEs T(s) Total: 6805 calsfx-24A-eta1Dor 8x14 8x14 8x120 12x120 8 44 3874 calsfx-24B-ksiDra 4x 6 4x 6 6x 6 6x60 8 28 1211 calsfx-24B-sky 6x 6 6x60 12 826 calsfx-24C-HD173511 4x 6 4x 6 4x 30 6x 30 4x30 8x60 8 38 1896 calsfx-24C-sky 4x30 8x60 12 1050 calsfx-24D-HR6348 4x 6 4x 6 4x 30 6x 30 4x30 8x60 8 38 1896 calsfx-24D-sky 4x30 8x60 12 1050 calsfx-24E-HR7341 4x 6 4x 6 4x 30 6x 30 4x30 8x60 8 38 1920 calsfx-24E-sky 4x30 8x60 12 1050 calsfx-24F-delDra 4x 6 4x 6 6x 6 6x60 8 28 1206 calsfx-24F-sky 6x 6 6x60 12 826 The number of DCEs is to the left of the "x", and the ramp time (in sec) is to the right. The number of DCEs is the total for each AOR, including both nod positions. (Version date: 2005 July 22)